Since our last update, we've completed the metallic structure, installed staircases, laid the first floor flooring, and started building fireproof walls around the structure. This new space, twice the size of DC1, will house our wiring loom production, avionics suite, trim components, and glazing production—all in partitioned, controlled areas.
We also highlight the machine shop's impressive 5-meter under-ceiling height, the new production control wall, and the expanded metrology lab designed for high-volume precision measurement.